Organization – NIRMA
Project – LIME KILN Package for NIRMA
Scope of TEL – Design, Basic Engineering, Detailed Engineering, Manufacture, Inspection, Testing, Supply, Painting, Packing, Marking, Transportation to Site, Unloading at site, Shifting to storage place, Safe Storage at site, Loading and transportation to site from Storage place to erection site, Site fabrication, inspection, testing, surface preparation, painting, Erection, pre-commissioning & Commissioning, conducting the performance Guarantee Test Run at site for “2 nos. LIME KILN (R-201J/K)” as a Package along with all auxiliaries accessories including Mechanical, Electrical, Instrumentation, Structural except Civil as per the requirements, future space provision for installing 4 nos. more lime kiln [Kiln no. R-201P (11 th ), R-201N (12 th ), R-201M (13 th ) and R-201L (14 th)] in future, modification work etc. for Lime Kiln & Carbonation Tower Project being set up at Kalatalav, Bhavnagar (Refer annexure-1 attached herewith for detailed scope of work)